was damaged beyond repair by foul weather in January 1921 and scrapped
Mackenzie was determined not to let the interloper escape and placed his Hurricane's starboard wing over the tail of the Bf
Germany 1945 by David Pentland
Oberfeldwebel Albert Kerscher
David and Goliath, Vernon, France, 27th August 1944 by David Pentland. (GS) SHN606 was damaged beyond repair byDHM1391. David and Goliath, Vernon, France, 27th August 1944 by David Pentland. Leading 30th Corps assault across the Seine at Vernon, 43rd Wessex Division gained an initial foothold on the east bank. Heroic efforts however by the Royal Engineers of 71st, 72nd and 73rd Field Companies, succeeded in constructing a Class 9 Bailey bridge (David, shown left) and a Second Class 40 bridge (Goliath, shown right) Despite constant enemy fire this amazing feat